according to the BG installation
instructions
Application areas: Platform Road drainage Fire Station Pedestrian zones Garage driveway Driveway Warehouse Country lane Parking (truck) Parking (car) Pavers Rest area Sports facility Garage
Picture | Load class (kN) | Features | Inlet cross-section (cm²/m) | Weight | Item no. |
---|---|---|---|---|---|
Ductile iron slotted grating | |||||
E 600
|
1,970 cm²/m
93.1 in²/ft |
37.5 kg
82.7 lb | 17040181 |
Features | Weight | Item no. | ||
---|---|---|---|---|
sump unit 2-parts | ||||
BG-FILCOTEN pro KIT NW 400 G, sump unit cast iron edge, silt bucket, 2-parts, pipe coupl. DN200 consisting of: 19060010 - sump unit bottom part 19060140 - sump unit upper part with cast iron edge 22214 - silt bucket Material: FILCOTEN HPC |
178.8 kg
394.2 lb | 10640192 | ||
BG-FILCOTEN pro KIT NW 400 G, sump unit cast iron edge, silt bucket, 2-parts, pipe coupl. DN300 consisting of: 19060011 - sump unit bottom part 19060140 - sump unit upper part with cast iron edge 22214 - silt bucket Material: FILCOTEN HPC |
226.6 kg
499.6 lb | 10640193 | ||
Silt bucket | ||||
BG silt bucket for sump unit NW 400, galvanized (BGZ-S SV, FCT pro) Material: galvanised steel |
3.8 kg
8.4 lb | 22214 | ||
front cap | ||||
BG-FILCOTEN, front cap NW 400, closed, galvanized (pro No. 0-30) Material: galvanised steel |
4.5 kg
10 lb | 19040213 | ||
end cap | ||||
BG-FILCOTEN, End cap NW 400, outlet DN200, galvanized (pro No. 0-30) Material: galvanised steel |
4.7 kg
10.4 lb | 19040214 | ||
BG-FILCOTEN, End cap NW 400, outlet DN300, galvanized (pro No. 0-30) Material: galvanised steel |
4.4 kg
9.7 lb | 19040215 | ||
bolting-material | ||||
BG-FILCOTEN, locking device kit complete BG-FILCOTEN pro - ductile iron grate M10 V (NW300, 400) consisting of: 1 piece 32106 Cage nut M10-140-47, galvanized, clamping range 3,3-4,7 mm + 1 piece 32036 safety screw DIN 6921, toothed lock, M10x35 mm, 8.8, black-galvanized Material: galvanised steel |
0.1 kg
0.2 lb | 32110 | ||
BG-FILCOTEN, locking device kit complete BG-FILCOTEN pro, DI grate, M10 STAINL. STEEL (NW300, 400) consisting of: 1 piece 32120 Cage nut M10-140-47, V2A, clamping range 3,3-4,7 mm + 1 piece 32121 Hexagon bolt with flange serrated, M10x35 mm, DIN 6921, A2 Material: stainless steel 1.4301 |
0.1 kg
0.2 lb | 32122 |
Work-life balance in the midst of work? It's possible. The AFAS Experience Center is a shining example of future-proof architecture. Which includes BG-Graspointner's drainage system
... moreHow do you imagine sustainable life in the city in the years to come? The open space design at the Puntigam Brauquartier in Graz provides some impressive answers.
... moreLiving in the city centre: expensive, cramped and lonely? The Puntigam Brauquartier is quite the opposite – with plenty of sustainable ideas.
... moreThe Puskás Arena in Budapest opened its gates in November 2019. Central Europe’s biggest and most modern soccer stadium was built to meet the criteria of the UEFA – and BG-Graspointner was part of the large scale construction project.
... moreSlovakia’s new National Stadium in Bratislava is located at the same site as its predecessor, but this new facility has a much more sophisticated drainage concept.
... moreHousing alone does not make for a great residential quarter. And the former Riedenburg barracks in Salzburg demonstrates the crucial role of landscape architecture.
... moreWith BG-BLACKLABEL we offer you a range of design gratings that combine top-class design with the usual BG-performance. Thanks to state-of-the-art production technology, there are no limits to your creativity ...
... moreSometimes unforeseen challenges can pop up in projects. In those moments, it’s critical to find quick and effective solutions.
... moreOriginally it was the České srdce ground, built in 1925 by what was then the first-division Vienna football club SK Slovan, and in 1973 it became home to FK Austria Wien – thus Generali Arena looks back not only on a long football tradition but also on a history of expansion and new buildings. The stadium’s recent renovation, carried out from 2016 to 2018, represents a major step forward, including in terms of sustainability.
... moreWhen a construction project puts people and their needs first, miracles can happen. With the redevelopment of Argyle Street, this major hub in the city center of Halifax is finally living up to its full potential. But this lavish new plaza-style streetscape is not just about looks. It easily meets all requirements of modern construction when it comes to functionality.
... moreThe Erste Campus, the Erste Group’s new head office in Vienna, is a real eye-catcher. The curvy building complex in the Belvedere quarter is organically shaped with smooth edges – a sophisticated natural design. Roof gardens on different levels add to the natural building concept. Furthermore, the Erste Campus is extremely sustainable, which is also followed through when it comes to the interior.
... moreDown to the last detail,
the top choice for professionals.
BG-FILCOTEN
when opposites
attract great things
Technology
Sustainability
Only a heavyweight
when it comes to features:
Any
questions?
Select a product to carry out the hydraulic averaging.
For a precise hydraulic calculation that takes account of the local conditions, please contact our Technical Support at sales.int@bg-graspointner.com.
Select a product to search for the references.