BG-FILCOTEN pro

The BG-FILCOTEN pro channel system doesn’t compromise on quality or durability. It is stable yet lightweight, can be adapted to suit your needs and can handle loads up to class E 600 (acc. to EN 1433). BG-FILCOTEN pro channels are also available as a mini version with a lower overall height.

Technical data

Load class E 600
Channel material FILCOTEN HPC
Length 500 mm, 1,000 mm
Width 360 mm
Height at channel end 360 - 460 mm

Application areas: platform road drainage Fire brigade access road Pedestrian zones Garage driveway driveway Storage area Country road Parking area (truck) Parking area (car) block paving Rest area Sports facility garage

New
Workplace with leisure centre

AFAS EXPERIENCE CENTER, LEUSDEN

Work-life balance in the midst of work? It's possible. The AFAS Experience Center is a shining example of future-proof architecture. Which includes BG-Graspointner's drainage system

... more
New
This garden will grow close to your heart

Open space design Brauquartier Graz

How do you imagine sustainable life in the city in the years to come? The open space design at the Puntigam Brauquartier in Graz provides some impressive answers.

... more
New
The future is here to stay

Brauquartier Puntigam Graz

Living in the city centre: expensive, cramped and lonely? The Puntigam Brauquartier is quite the opposite – with plenty of sustainable ideas.

... more
New
Puskás Arena Budapest

A champion in size

The Puskás Arena in Budapest opened its gates in November 2019. Central Europe’s biggest and most modern soccer stadium was built to meet the criteria of the UEFA – and BG-Graspointner was part of the large scale construction project.

... more
New
NÁRODNÝ FUTBALOVÝ ŠTADIÓN

Kick-Off in Bratislava

Slovakia’s new National Stadium in Bratislava is located at the same site as its predecessor, but this new facility has a much more sophisticated drainage concept.

... more
New
RESIDENTIAL QUARTER RIEDENBURG

Salzburg’s living beauty

Housing alone does not make for a great residential quarter. And the former Riedenburg barracks in Salzburg demonstrates the crucial role of landscape architecture.

... more
New
BLACKLABEL design line

The Art of Drainage ...

With BG-BLACKLABEL we offer you a range of design gratings that combine top-class design with the usual BG-performance. Thanks to state-of-the-art production technology, there are no limits to your creativity ...

... more
New
RESIDENTIAL QUARTER RIEDENBURG

We’ll always find a way. Or two.

Sometimes unforeseen challenges can pop up in projects. In those moments, it’s critical to find quick and effective solutions.

... more
New
The new Generali Arena

A win for Austria Wien

Originally it was the České srdce ground, built in 1925 by what was then the first-division Vienna football club SK Slovan, and in 1973 it became home to FK Austria Wien – thus Generali Arena looks back not only on a long football tradition but also on a history of expansion and new buildings. The stadium’s recent renovation, carried out from 2016 to 2018, represents a major step forward, including in terms of sustainability.

... more
New
PROJECT REPORT ARGYLE STREET HALIFAX

Developing the city center.

When a construction project puts people and their needs first, miracles can happen. With the redevelopment of Argyle Street, this major hub in the city center of Halifax is finally living up to its full potential. But this lavish new plaza-style streetscape is not just about looks. It easily meets all requirements of modern construction when it comes to functionality.

... more
New
Project report Erste Campus Vienna.

A curvy challenge.

The Erste Campus, the Erste Group’s new head office in Vienna, is a real eye-catcher. The curvy building complex in the Belvedere quarter is organically shaped with smooth edges – a sophisticated natural design. Roof gardens on different levels add to the natural building concept. Furthermore, the Erste Campus is extremely sustainable, which is also followed through when it comes to the interior.

... more

rail station platform

car parking airport Prague

crosswalk commercial area

BG-FILCOTEN pro in residential complex

access to delivery zone

Leopold's plateau on the Petrovaradin fortress – Novi Sad, Serbia

logistics center

car parking

car parking

car parking

courtyard private garage

courtyard

residential quarter Riedenburg, Austria

Warsaw Ring S2

Download category

Down to the last detail,

the top choice for professionals.

Easy access

  • Simple cleaning of the outlet unit
  • Large outlet opening in the channel bottom
  • Suspended silt bucket for sump unit
  • Total length 500 mm
+

End cap

  • End cap with DN 150 outlet
  • Conducts the water through a connection and into the sewer system
  • Galvanised/stainless steel
+

Sump unit

  • Easy maintenance and cleaning of the drainage system
  • Suspended silt bucket for sump unit
  • Sealed pipe connection
  • Total length 500 mm
+

Special element

  • Smooth side wall for outlets
  • T-piece & crossings possible
  • NW 100/ 150/ 200
  • Length 500 mm, element height no 5-0
+

Extremely durable hold in the concrete bed

  • Lateral anchoring pockets for maximum hold in the concrete bed
  • Permanent fit in the concrete foundation thanks to identical linear expansion coefficient
  • Perfect connection between HPC and concrete
+

Front cap

  • For a clean end to a channel line
  • Galvanised/stainless steel
+

Floor drain

  • Channel with vertical outlet
  • Sealed connection to the sewer pipe possible
+

BG-FILCOTEN

when opposites

attract great things

 

FILCOTEN HPC (High Performance Concrete) is a material that unites outstanding technical properties with ecological sustainability. The optimised high-density structure of HPC makes it possible to construct extremely stable lightweight drainage channels – but it’s the idea behind it that makes it unique. 

Unique concept, revolutionary results. 
Our engineers wanted to bring together two extremes:
maximum performance with minimum environmental impact. 

Maximum performance, minimal environmental impact. 
After intensive development, they finally achieved their goal. FILCOTEN HPC 
embodies these opposites, making it unique in the market. 
 

Technology

I Minimal weight
  • FILCOTEN HPC enables lightweight construction
  • Quick and easy to lay
  • Dimensionally stable, robust concrete elements
I Maximum durability
  • Unsurpassed stability and durability
  • Exceptional pressure resistance, well above the requirements in EN 1433 
I Resistant to extreme temperatures and UV light 
  • Maximum resistance to frost and de-icing salt
  • UV resistant 
I Fireproof
  • Non-combustible construction material – Class A1
  • so no harmful smoke development
I Perfect hold in the concrete bed
  • Ideal coefficient of expansion, identical to that of the surrounding concrete
I High drainage performance
  • Low water collection and penetration
  • Smooth channel surface for high drainage performance and optimal self-cleaning effect

Sustainability

I Verified LCA (life cycle assessment)
  • Greater ecological transparency under ISO 14040/14044 and EN 15804
  • Ideal for sustainable construction projects
I Sustainable production
  • Manufactured with 100% green power
  • Resource-efficient manufacturing process
I Exceptional resource-efficiency
  • 100% recyclable, certified
  • Quality class U-A (certified by the Bautechnische Versuchs- und Forschungsanstalt Salzburg (bvfs)).
I Certified for sustainability and tested for hazardous substances
  • Environmental & energy management certified under ISO 14001/50001 at the location in Oberwang, Austria
  • Certified organic material that meets the strict testing criteria of the Institute for Biologically Sound Construction Rosenheim (IBR) with regard to heavy metals, VOCs, biocides and radioactivity, styrene-free

Only a heavyweight

when it comes to features:

Three edge variants

Edges made of galvanised steel, stainless steel or cast iron are available.
+

Channel geometry/smooth surface

The optimised channel geometry and smooth surface of FILCOTEN HPC ensure maximum flow and self-cleaning effects
+

Safety seam

A sealable safety seam enables a sealed connection between the individual segments.
+

Standard outlets

Every channel body without an inner slope has a vertical outlet option.
+

Bolted iron grip

As an alternative to the fiX locking system, cast iron gratings in cl. D or E (see table depending on the nominal width) can be bolted to the cast iron edge with 4-point bolting. All fittings are supplied as a kit. Our fittings are simple and easy to change. The cage nuts are replaceable and securely fit in the cast iron edge.
+

Secure hold for the grating

The intelligent fiX locking system enables the simple four-point quick-locking of the grating in the channel. The integrated pins to prevent longitudinal shifting provide added safety.
+

Perfect channel installation

Anchoring pockets ensure a secure bond and anchoring of the channel in the concrete foundation.
+

Innovative production technology

The innovative FILCOTEN HPC production and moulding technology made it possible to design anchoring pockets for a concrete channel body for the very first time, ensuring an even better hold in the concrete bed.
+

Stable thanks to the FEM analysis

The FEM analysis is a computer-assisted process which simulates exactly which structures withstand which loads. The more accurately the effect of the forces is known, the easier it is to choose the optimal solution.
+

Advantages at a glance

- Three edge variants: Steel, Stainles Steel or cast - optimised channel geometry and smooth surface - sealable safety seam
Advantages at a glance
BG- sealing system
applicable for channels with safety fitting